Where Are We
Portugal
Designation | Client | Voltage Level | Year |
---|---|---|---|
Framework Agreement - Maintenance Contracts of lines MAT - Zone 1 (North) | REN – Rede Eléctrica Nacional, S.A. | 150 / 220 / 400 KV | 2017-2019 |
Construction, Repair and Maintenance Works of Distribution HV, MV and LV Networks in Continual Works Regime | EDP Distribuição – Energia, S.A. | Up to 60 KV | 2015-2017 |
Construction and Maintenance of Substations - Electrical Part - Continual Contract | EDP Distribuição – Energia, S.A. | Up to 60 KV | 2015-2017 |
Feira Line – Lavos – Feira section – P63 – Renovation and Uprating | REN – Rede Eléctrica Nacional, S.A. | 400 KV | 2016-2017 |
Line Vilar do Monte Hydroelectric Use – Gumiei Substation (EDP) | Hydrocontracting Portugal, Lda | 60 KV | 2016-2017 |
Construction and Maintenance of Substation – Civil Construction - Continual Contract | EDP Distribuição – Energia, S.A | - | 2015-2017 |
Construction of the Alcains Substation | EDP Distribuição – Energia, S.A | - | 2016-2017 |
Construction Work at the Santarém Substation | REN – Rede Eléctrica Nacional, S.A. | - | 2017 |
Construction Work at the Armamar Substation and Valdigem Substation | REN – Rede Eléctrica Nacional, S.A. | - | 2015-2016 |
Pego Line – Falagueira – Renovation by Uprating | REN – Rede Eléctrica Nacional, S.A. | 400 KV | 2016 |
Installation of OPGW guard cable on the Riba d'Ave – Recarei Line | REN – Rede Eléctrica Nacional, S.A. | 400 KV | 2016 |
Fratel – Falagueira line – Renovation by Uprating | REN – Rede Eléctrica Nacional, S.A. | 150 KV | 2016 |
Dismantling of the Riba d’Ave – Ermesinde 4 Line – from pole no. 28 to pole no. 64 | REN – Rede Eléctrica Nacional, S.A. | 150 KV | 2016 |
Supply of materials and assembling of the double three-strand line FRADES – CANIÇADA – Section between SE Pedralva and Pole no. 42) | REN – Rede Eléctrica Nacional, S.A. | 400 KV | 2015 |
Vieira do Minho – Pedralva 2 Line | REN – Rede Eléctrica Nacional, S.A. | 150 KV | 2015 |
Dismantling of the Riba d’Ave – Ermezinde 1 and 2 lines – 40 metallic poles | REN – Rede Eléctrica Nacional, S.A. | 150 KV | 2015 |
Madeira
Designation | Client | Voltage Level | Year |
---|---|---|---|
Substation Interconnection | EEM – Eletricidade da Madeira | 60/30 KV | 2015 |
Spain
Designation | Client | Voltage Level | Year |
---|---|---|---|
Continual FTTH network construction | COMSAINSTALACIONES Y SISTEMAS INDUSTRIALES, SLU | - | 2017 |
Continual FTTH network construction | LITEYCA, S.L. | - | 2016 |
Continual FTTH network construction | MONTELNOR | - | 2016 |
Continual FTTH network construction | COMSAINSTALACIONES Y SISTEMAS INDUSTRIALES, SLU | - | 2016 |
France
Designation | Client | Voltage Level | Year |
---|---|---|---|
Conductor Cables Replacement Work 400kV Line Champany – Vaujany | EIFFAGE ENERGIE, Transport & Distribution / RTE | 400 KV | 2017 |
Rehabilitation Works of 63kV Line Landres – Montois – Works and poles and cables | EIFFAGE ENERGIE, Transport & Distribution / RTE | 63 KV | 2017 |
Rehabilitation Works of 225kV Line Aube – Mezerolles – Assembling and replacement of poles | EIFFAGE ENERGIE, Transport & Distribution / RTE | 225 KV | 2017 |
Rehabilitation Works of 225kV Line Aube – Mezerolles – Assembling and replacement of poles | EIFFAGE ENERGIE, Transport & Distribution / RTE | 225 KV | 2016 |
Reconstruction Works of Line 2 x 400kV Lonny – Seuil – Vesle | EIFFAGE ENERGIE, Transport & Distribution / RTE | 400 KV | 2016 |
Works on poles and cables in lines for the crossing of the river Loire – Nantes | EIFFAGE ENERGIE, Transport & Distribution / RTE | 63/225/400 KV | 2016 |
Reconstruction Works of Line 2 x 400kV Lonny – Seuil – Vesle | EIFFAGE ENERGIE, Transport & Distribution / RTE | 400 KV | 2015 |
Works on the 63kV Line Baud – Poteau Rouge | EIFFAGE ENERGIE, Transport & Distribution / RTE | 63 KV | 2015 |
Germany
Designation | Client | Voltage Level | Year |
---|---|---|---|
Reinforcement of Poles – Regennsburh - Schwandrof | TENNET | - | 2017 |
Modification work of the 220kV Line EMDEN_BORSSUM –EMDEN_OST | TENNET | 220 KV | 2016-2017 |
Modification work of the 110kV and 380kV Lines Umbau Der Freileitungen am Umspannwerk Hardegsen | TENNET | 110/380 KV | 2016 |
Replacing Separators 400 Kv LINE | TENNET | 400 KV | 2015 |
Execution of Foundations in the 110 KV Line | ETM | 110 KV | 2015 |